Today, the major challenges for Edge Computing and 5G infrastructures, in general, are primarily deployment speed, how to roll out tens of thousands of Edge Data Centers at the speed of “now,” manage costs and be sensitive to the environment, all at the same time. Prime’s new line of prefabricated Modular Data Centers with Intelligent Natural Air Cooling addresses all these needs. Prime Wire & Cable creates economies of scale by utilizing the same components and a limited amount of structures which enables speed to market in 50 – 60% less time than traditional Edge solutions for 5G Macro-Sites or Enterprise environments. By utilizing Natural (free) Air Cooling with Siemens Environmental controls, they cut cooling costs by 50% over traditional HVAC methods – a vital step considering that cooling data centers draws approximately 50% of the power required to run a data center. Their supplemental evaporative cooling method uses 75% less water than traditional water-based cooling systems – once again being sensitive to the environment. MANUFACTURER OF PREMIUM WIRE AND CABLE PRODUCTS
< Page 3 | Page 5 >